Cleveland Bridge UK Ltd

Purpose Built Civil Engineering Facility

Darlington Facility 37,000 Square Metre Capacity

The Headquarters and Engineering Centre of the company are situated at Darlington Co Durham along-side a purpose build manufacturing facility.
The site is 22 acres with 27000m2 of covered fabrication area and has 6 no Paint Cells for the application of high specification paint systems including Metal Spraying and Glass Flake systems.
We have Heavy Lift capacity along with specialist Deck Panel and Girder Building Equipment.
The track record of the company is second to none with a list of world class and record breaking projects to its credit.

Latest Technology Equipment

Brake press, 640te 16M span. Through investment in the latest technology and equipment, services have been developed to suit the requirements for almost any project.
Our 3D-computer modelling capability uses the latest software developed specifically for steel manufacture, and with links with our draughting offices and manufacturing unit, we provide a cost-effective solution to requirements on any project.





http://www.clevelandbridge.com/




No comments:

Post a Comment